Sr Construction Scheduling Manager

11 Nov 2025
Apply

Company DescriptionWork with Us. Change the World.At AECOM, we're delivering a better world. Whether improving your commute, keeping the lights on, providing access to clean water, or transforming skylines, our work helps people and communities thrive. We are the world's trusted infrastructure consulting firm, partnering with clients to solve the world’s most complex challenges and build legacies for future generations.There has never been a better time to be at AECOM. With accelerating infrastructure investment worldwide, our services are in great demand. We invite you to bring your bold ideas and big dreams and become part of a global team of over 50,000 planners, designers, engineers, scientists, digital innovators, program and construction managers and other professionals delivering projects that create a positive and tangible impact around the world.We're one global team driven by our common purpose to deliver a better world. Join us.Job DescriptionAECOM Hunt has an exciting opportunity in the Dallas, TX market for a seasoned Scheduling Manager.

Skilled in the development of commercial strategies. Capable of participating in negotiations.

Requires a demonstrated ability to effectively lead the project controls function on a medium to large project.

Documents employee performance issues and plays an instrumental role in resolution as appropriate.

Assumes mentoring and training roles as requested and identifies high potential employees to management.

Conducts root cause analysis.

Drafts comprehensive project procedures.

Possesses proven knowledge of scope control and change management.

Utilizes extensive knowledge of construction contracting including the manner in which contract type effects implementation of project controls systems.

Reviews performance trends, prepares analysis and cost impact and monthly project performance reports, and recommends contractor invoices for approval.

Evaluates manpower, labor hour, and labor cost requirements versus budget limitations.

Oversees the production and maintenance of accurate project schedules. Expert understanding of schedule resource loading and leveling.

Assists the Project Manager in budgeting and managing incentive programs.

Holds an expert understanding of schedule, critical path analysis, resource loading and leveling.

Establishes and maintains client relationships.

Has the ability to review and analyze project program and oversee the production of accurate progress/performance reports.

Able to review and assess (as required) raw data that comes from project automated systems.

Serves as a key participant in client and/or subcontractor negotiations

Participates in staffing decisions for projects.

Ensures that a tracking database is developed and maintained to cross check subcontractor funding is aligned with work authorization and expenditures.

Involved in tracking system to ensure that Project Management team is fully aware of detailed change order status.

About Construction Management – AECOM HuntAECOM Hunt is a national construction manager and design-builder specializing in commercial, aviation, sports (arenas and stadiums), higher education, convention center, residential and hospitality projects. Founded on a reputation of professionalism and quality, with the financial backing of AECOM, we are one of country’s premier builders.QualificationsMinimum Requirement:

BA/BS and 10 years of relevant construction experience or demonstrated equivalency of experience and/or education, including 2 years of leadership.

Construction scheduling experience.

Preferred Requirements:

10 years of experience working as a Construction Scheduler with specific experience in mega-projects in the following industries:

Higher education

Sports Stadium

Hospitality

Airport

Convention Center.

Experience working for a large GC on construction projects in excess of 500 MM.

Experience in project controls and cost estimating in the public sector.

Expert level proficiency with Oracle Primavera P6 and BIM scheduling.

Ability to work independently as well as interact with teams.

Microsoft office (Excel, Word, Outlook, Teams) proficiency.

Experience analyzing schedule variances.

Additional Information

This position does not include sponsorship for United States work authorization now or in the future.

Qualified applicants who are offered a position must pass a pre-employment substance abuse test.

Offered compensation will be based on location and individual qualifications. The expected range is $126,505.00 - $234,034.00.About AECOMAECOM is proud to offer comprehensive benefits to meet the diverse needs of our employees. Depending on your employment status, AECOM benefits may include medical, dental, vision, life, AD&D, disability benefits, paid time off, leaves of absences, voluntary benefits, perks, well-being resources, employee assistance program, business travel insurance, service recognition awards, retirement savings plan, and employee stock purchase plan.AECOM is the world’s trusted infrastructure consulting firm, delivering professional services throughout the project lifecycle – from advisory, planning, design and engineering to program and construction management. On projects spanning transportation, buildings, water, new energy and the environment, our public- and private-sector clients trust us to solve their most complex challenges. Our teams are driven by a common purpose to deliver a better world through our unrivaled technical and digital expertise, a culture of equity, diversity and inclusion, and a commitment to environmental, social and governance priorities. AECOM is a Fortune 500 firm and its Professional Services business had revenue of $14.4 billion in fiscal year 2023. See how we are delivering sustainable legacies for generations to come at aecom.com and @AECOM.Freedom to Grow in a World of OpportunityYou will have the flexibility you need to do your best work with hybrid work options. Whether you’re working from an AECOM office, remote location or at a client site, you will be working in a dynamic environment where your integrity, entrepreneurial spirit and pioneering mindset are championed.You will help us foster a safe and respectful workplace, where we invite everyone to bring their whole selves to work using their unique talents, backgrounds and expertise to create transformational outcomes for our clients.AECOM provides a wide array of compensation, benefits and well-being programs to meet the diverse needs of our employees and their families. We’re the world’s trusted global infrastructure firm, and we’re in this together – your growth and success are ours too.Join us, and you’ll get all the benefits of being a part of a global, publicly traded firm – access to industry-leading technology and thinking and transformational work with big impact and work flexibility. As an Equal Opportunity Employer, we believe in each person’s potential, and we’ll help you reach yours.All your information will be kept confidential according to EEO guidelines.ReqID: J10118887Business Line: CM Construction ManagementBusiness Group: CMStrategic Business Unit: CMCareer Area: Program & Project ManagementWork Location Model: On-SiteLegal Entity: Hunt Construction Group

Full-time
  • ID: #52864874
  • State: Texas Dallas / fort worth 75201 Dallas / fort worth USA
  • City: Dallas / fort worth
  • Salary: USD TBD TBD
  • Showed: 2024-11-11
  • Deadline: 2025-01-10
  • Category: Et cetera
Apply