Construction Scheduling Specialist III

29 Mar 2025
Apply

The Project Scheduler III prepares summary-level and detailed schedules for proposed or current construction projects. Schedules will be prepared using bar chart or CPM format, as required by the project team or Client, using Primavera P6 Software. Provide updates as required for each project and schedule training and software support as needed. Responsible for ensuring all project scheduling activities comply with corporate standards and contractual requirements.ResponsibilitiesPrepares summary-level and detailed schedules for proposed or current construction projectsProvide updates as required for each project and schedule training and software supportResponsible for ensuring all project scheduling activities comply with corporate standards and contractual requirements

  • ID: #53740660
  • State: Missouri St louis 63011 St louis USA
  • City: St louis
  • Salary: USD TBD TBD
  • Job type: Full-time
  • Showed: 2025-03-29
  • Deadline: 2025-05-28
  • Category: Et cetera
Apply